ATK

ATK logoATK was tasked by NASA with designing the wiring harnesses for the booster rockets powering the replacement for the Space Shuttle while employing a team that is significantly smaller than that used on the now-cancelled Ares I project. ATK accomplished its mission by using E3.series to substantially increase productivity, while eliminating the need for a physical mock-up and costly test lab.

Read More

Was this article helpful?
0 out of 0 found this helpful

Comments

0 comments

Please sign in to leave a comment.